Reg No.:_ Name:

G192100 Pages:4

APJ ABDUL KALAM TECHNOLOGICAL UNIVERSITY

SEVENTH SEMESTER B.TECH DEGREE EXAMINATION(R&S), DECEMBER 2019

Max. Marks: 100

b)
2 a)
b)
3 a)
b)

Course Code: CE409
Course Name: QUANTITY SURVEYING AND VALUATION

Instruction : Assume any missing data suitably
PARTA
Answer any two full questions, each carries 10 marks.
Explain the use of CPWD schedule of rates and how it is applied for the
construction work in the different states of India.
Write the unit of measurement of (i) DPC using waterproofing compound (ii) Iron
work for window (iii) Water proof Painting above roof slab

Calculate the amount required for carriage of 2500kg of steel reinforcement to be
brought from a source of 6km away from the site. The vehicle access is only upto
75m away from the construction site.

CPWD data are as follows for mechanical transport of 1 tonne of steel at
[email protected]; [email protected]; [email protected]; beyond 5km upto 10km per km
@Rs.7.72 ; and for transport of 1 tonne of steel by manual labour Rs.144.20/- for
first 5011101085 and Rs.21.16/- for every additional 5Ometre or part thereof.
Reproduce detailed specification of Earthwork excavation for foundation in
ordinary soil.

Develop rate analysis for DSR item No.5.3, Reinforced cement concrete work with
1:1.5:3 (3 graded stone aggregate 20 mm nominal size) in beams, suspended floors,
roofs having slope up to 15° landings, above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement.

Material : 20mm Aggregate ‏“م0.57‎ @1300/m° , 10mm 0.28m°@ 21300/m’,
coarse sand (Zone 111) 0.425m*@z1200/m , Portland cement 400kg@ %5700/tonne.
Labour : Mason 0.24@%467/day, Beldar 2.75@%368/day, Bhisti 0.90@2407/day,
Coolie 1.88@2368/day

Carriage provisions : Stone aggregate below 40mm 0.85m°@2103.77/m* ,Coarse
sand .425m? © रं 103.77/m*, Portland cement [email protected]/tonne

Hire Charges for concrete mixer 0.08@%800/day, Vibrator needle type
२0.08 @350/day

Sundries (LS) [email protected].

Adopt water charges, contractor profit and overheads as per the CPWD DSR2016
provisions.

List any four item generally considered under overhead charges.