10000CE409122102
alternate bars cranked distributi 3
= istribution bars
10mm © main 4
Bae ہے 8mm © @ 25cm c/c
7 77
2 ہہ ےم _ |
main bar 1Omm © 1 ا سر
@ 20cm ೮/೮ ८
~.
330-—_____________120—
Prepare a detailed estimate of a septic tank from the given drawings (25)
0. 1.00% “tT
50mm Dia. ೦. |. Ventilating pipe 2mm High
75௭ १. 0. ©. Slab Precast
प~ + ರ್ಯ
و یم യം
PART ^
Answer any two full questions, each carries 15 marks.
a) A building costing Rs 8,00,000/- has been constructed on a freehold land measuring 200 (10)
sqm recently in a big city. Prevailing rate of land in the neighbourhood is Rs 250 per