Semester : SEMESTER 7
Subject : Transportation Engineering -II
Year : 2020
Term : MARCH
Branch : CIVIL ENGINEERING
Scheme : 2015 Full Time
Course Code : CE 407
Page:2
a)
b)
0)
a)
b)
a)
b)
a)
b)
G193008 Pages:2
Explain with neat sketch Reception signal and Departure signals
Explain the procedure of periodic track maintenance in detail.
Differentiate between C.T.C. system and A.T.C. system
PART C
Answer any two full questions, each carries 20 marks.
What are the requirements of a good harbour?
Compare mound type break water with wall type breakwater with the help of
sketches
Explain the shield method of tunnelling with help of a sketch
What is the necessity of railway tunnel? Draw a sketch to illustrate a single track
railway tunnel?
Explain in detail the procedure of providing drainage and ventilation in tunnels.
Write short notes on:
(i) Moorings
(ii) Wharves
(111) Transit Shed
(iv) Quays
Page 2 of 2
(5)
(5)
(5)
(10)
(10)
(10)
(10)
(10)
(10)