E G1101 Pages: 3
Reg No.:_. Name:
APJ ABDUL KALAM TECHNOLOGICAL UNIVERSITY
SEVENTH SEMESTER B.TECH DEGREE EXAMINATION(S), MAY 2019
Course Code: CE409
Course Name: QUANTITY SURVEYING AND VALUATION
Max. Marks: 100 Duration: 3 Hours
PARTA
Answer any two full questions, each carries 10 marks. Marks
1 a) List different type of estimates (4)
b) Work out the quantity of given materials required for 1:1.5:3 concrete and (6)
Description
20mm (nominal 5126)
broken stone
Sand ?
5700 Tonne
Mason 0.200 Nos 500.00 Each
Man 1.000 Nos 450.00 Each
Women 3.500 Nos 450.00 Each
Man for lifting materials 0.200 Nos 450.00 Each
2 a) List the essential documents to be accompanied with the detailed estimate (6)
0) What is mean by overhead charges? Give the percentage adopted for the (4)
contractor’s profit and overhead in CPWD DSR 2016 rate analysis.
3 Write the detailed specification for brickwork in cement mortar 1:5. (10)
PART 13
Answer any two full questions, each carries 25 marks.
4 Prepare detailed estimate for the following items of work for the construction of (25)

residential building

(a) RRM for foundation (75cm x 75cm) and basement50cm x 50cm ,
Wall thickness 20cm

(b) Quantity of earth filling inside the plinth

(c) RCC works for slab (12cm thick), lintel (15cm thick), and sun
shade (60cm projection).

(d) Painting for walls, doors(D1-100x210; D2 80x210) and
windows (W2-100x150; W3-150x150:K W 1-50x100;K W2-
100x100); V(90x60).

All dimensions are in centimetres. Any missing data may be suitably assumed.

Page lof 3